PROCESS
Our system designed to follow up the acknowledgement receipt
of the order from the supplier according to the following criteria:-
For AOG orders, acknowledge must be within 24 hrs.
For CRT orders, acknowledge must be within 7 days.
For ROT orders, acknowledge must be within two weeks.
A reminder is sent to the supplier if the acknowledgement
time exceeds the above-mentioned criteria.
Upon receiving the pro-forma invoice from the supplier our
item manager studies the compliance of the pro-forma invoice
contents regarding:-
- Technical data requested in P/O.
- Quality document requested in P/O.
- Qty requested in P/O.
- Payment terms rules of EGYPTAIR MAINTENANCE & ENGINEERING.
- Suitable shipping date requested.
The system follows up payment process with financial directorate
and gets the payment information and submits it to the supplier
and receives the shipping details from theme.
There is a very adequate system at EGYPTAIR MAINTENANCE & ENGINEERING for Acceptance/Inspection
of the material received from outside contractors/suppliers
by Standard Receiving Inspection (SRI) or Tech Receiving Inspection
(TRI) if required.
The system forwards only the material which passes the full
inspection and acceptance for the received materials to store.
Any discrepancy during SRI for any rejected past will route
the material to the Hold area. |